The Final Phase

tannery_bridge

We are putting together the final figures and we need to raise about £150,000 to complete the project.
 

At The Tannery end of the Bridge there will be a Lifting Platform and steps leading to The Tannery Gallery and the Sculpture Space.

The floor will be levelled and the surface will be Indian sandstone in the Sculpture Space and oak in the gallery.

We have to clad the interior walls of the Gallery and one interior and one exterior wall of the Sculpture Space to meet Building Standards and we have to install heating, security alarms and complete the electrics.

The other major item will be landscaping the area above The Tannery.

Anything you can do to help us get this lovely old building up and running as soon as possible will be immensely welcome.
 